Eurocode 7 Design Approaches 1, 2 and 3 for piles
DA1, DA2 and DA3 for pile design: the A, M and R factor sets, the recommended resistance factors, which combination governs, and one pile sized under all three.
Eurocode 7 has three Design Approaches, and for piles they answer one question: where does the safety margin go? DA1 checks two combinations, one with the margin on actions and one with it on resistance. DA2 puts a margin on both in a single check. DA3 puts it on actions and ground strength. The same pile in the same ground can come out at three different lengths, so it matters which one your National Annex picks.
The four combinations
| Approach | Actions | Ground strength | Resistance |
|---|---|---|---|
| DA1, combination 1 | A1 (γG 1.35, γQ 1.5) | M1 (1.0) | R1 |
| DA1, combination 2 | A2 (γG 1.0, γQ 1.3) | M1 (1.0) | R4 |
| DA2 | A1 (γG 1.35, γQ 1.5) | M1 (1.0) | R2 |
| DA3 | A1 (γG 1.35, γQ 1.5) | M2 (tan φ′ 1.25, cu 1.4) | R3 |
These are the combinations for the axial resistance of a pile, as listed in JRC EUR 26227 §8.5. Under DA1 combination 2 the standard switches to M2 for unfavourable actions that come from the ground, such as negative skin friction, and under DA3 it uses A2 for geotechnical actions. Neither changes the resistance side of an ordinary axial check.
Recommended resistance factors (EN 1997-1 Tables A.6 to A.8)
| Pile type | Factor | R1 | R2 | R3 | R4 |
|---|---|---|---|---|---|
| Driven | base γb | 1.0 | 1.1 | 1.0 | 1.3 |
| Driven | shaft γs | 1.0 | 1.1 | 1.0 | 1.3 |
| Driven | total γt | 1.0 | 1.1 | 1.0 | 1.3 |
| Bored | base γb | 1.25 | 1.1 | 1.0 | 1.6 |
| Bored | shaft γs | 1.0 | 1.1 | 1.0 | 1.3 |
| Bored | total γt | 1.15 | 1.1 | 1.0 | 1.5 |
| CFA | base γb | 1.1 | 1.1 | 1.0 | 1.45 |
| CFA | shaft γs | 1.0 | 1.1 | 1.0 | 1.3 |
| CFA | total γt | 1.1 | 1.1 | 1.0 | 1.4 |
| All types | shaft in tension γs;t | 1.25 | 1.15 | 1.1 | 1.6 |
These are the recommended values, as reproduced in JRC EUR 26227 Table 8.4.3. A National Annex can replace any of them. The UK National Annex, for example, sets every R1 factor to 1.0 and raises R4.
Design Approach 1: two checks
Combination 1 factors the actions heavily and the resistance lightly. Combination 2 does the reverse. A design passes DA1 only if both pass, and the result is whichever demands more pile.
For a driven pile carrying a permanent to variable load ratio of 2 to 1, the average action factor is 1.40 under A1 and 1.10 under A2. Multiply by the resistance factor and combination 1 has an overall factor of 1.40 × 1.0 = 1.40, against 1.10 × 1.3 = 1.43 for combination 2. The two are close, which is why neither can be skipped: more permanent load pushes combination 1 up, and a bored pile's base factor of 1.6 pushes combination 2 up.
Design Approach 2: one check
DA2 applies A1 to the actions and a flat 1.1 to the resistance. For the same driven pile the overall factor is 1.40 × 1.1 = 1.54, about 8 percent above DA1. It treats driven, bored and CFA piles alike in compression, so it does not reward or penalise the installation method the way R1 and R4 do.
Design Approach 3: factor the ground
DA3 leaves the resistance factors at 1.0 in compression and instead divides the ground strengths by the M2 set before the resistance is calculated: tan φ′ and c′ by 1.25, and the undrained strength cu and the unconfined strength qu by 1.4.
That has two consequences for piles. First, there has to be a strength parameter to factor, so DA3 fits only a resistance calculated from ground parameters. JRC EUR 26227 §8.5 advises against it for piles designed from load tests or from profiles of test results. PileCalc follows that and offers DA3 with the characteristic-parameter source only.
Second, the calculation method must not undo the factor. In an α method the adhesion ratio rises as cu falls, so reading α at the reduced strength would hand back most of the 1.4. JRC example A.8.2.3 holds α constant, so the shaft resistance falls by the full factor. PileCalc does the same: the NAVFAC adhesion ratio, the FHWA drilled-shaft α and the rock-socket law are read at the characteristic strength, and the response says so.
Same pile, three lengths
JRC EUR 26227 example A.8.2 makes the difference concrete. A 0.45 m driven pile carries Gk = 600 kN and Qk = 300 kN into stiff boulder clay with cu = 270 kPa, using the Irish National Annex model factor of 1.75. The required shaft length in the bearing stratum is:
| Approach | Design action Fc;d | Design resistance Rc;d (kN, Ls in m) | Required Ls |
|---|---|---|---|
| DA1, combination 1 | 1260 kN | 221 + 87.4 · Ls | 11.9 m |
| DA1, combination 2 | 990 kN | 170 + 67.3 · Ls | 12.2 m |
| DA2 | 1260 kN | 201 + 79.5 · Ls | 13.3 m |
| DA3 | 1260 kN | 158 + 62.3 · Ls | 17.7 m |
DA1 needs 12.2 m (combination 2 governs), DA2 needs 13.3 m and DA3 needs 17.7 m. DA3 is the longest here because the 1.4 on cu is larger than any R factor it replaces. The arithmetic behind each row is in the worked example.
Which approach applies where
- United Kingdom: DA1 only, with national R4 values and a model factor. See pile design to the UK National Annex.
- Ireland: all three approaches. With DA3 in ground of low shear strength, the Irish National Annex also requires A1+M1+R1 to be considered (Orr, 2007). PileCalc always checks it alongside DA3.
- Italy: NTC 2018 uses Approccio 2 (A1+M1+R3) for piles, with its own R3 values. See NTC 2018 pile design.
- Elsewhere: read the National Annex to EN 1997-1 of the country the structure is in. It names the approach and may change every factor above.
Checking all of them in PileCalc
In the axial pile, drilled-shaft and capacity-vs-length tools, limit-state design takes the Design Approach as one selection. DA1 runs both combinations and reports the governing one. Switching approach reruns the same pile with the other factor sets, so a comparison like the table above takes a few clicks. The capacity-vs-length tool reports the shortest swept length that passes every combination. For the full procedure see the Eurocode 7 pile design guide and the design mode docs.
Common questions
What are the three Design Approaches in Eurocode 7?
They are three ways of combining the partial factor sets on actions (A), ground strengths (M) and resistances (R). For piles, Design Approach 1 checks two combinations, A1+M1+R1 and A2+M1+R4. Design Approach 2 is A1+M1+R2. Design Approach 3 is A1+M2+R3, which factors the ground strength instead of the resistance.
Which Design Approach should I use for pile design?
The one your National Annex prescribes. The UK National Annex permits Design Approach 1 only. The Irish National Annex allows all three. Italy's NTC 2018 has its own Approccio 2 (A1+M1+R3) for piles. For a project outside those, read the National Annex of the country the structure is in.
Which combination governs in Design Approach 1 for piles?
Usually combination 2 (A2+M1+R4), because the R4 resistance factors outweigh the larger A1 action factors of combination 1. It is not guaranteed: a pile with a large permanent load and a low R4 shaft factor can be governed by combination 1, so both must be checked.
Why is Design Approach 3 rarely used for piles?
Its resistance factors are 1.0 in compression, so the whole margin on resistance has to come from factoring the ground strength. That only makes sense when the resistance is calculated from strength parameters. JRC EUR 26227 §8.5 advises against it for piles designed from static load tests or from profiles of ground test results, where there is no strength parameter to factor.
Does Design Approach 2 always give a longer pile than Design Approach 1?
With the recommended values and a driven pile, DA2 carries an overall factor about 8 percent higher than DA1 combination 2 for a permanent to variable load ratio of 2 to 1. In the published JRC example A.8.2 the required shaft length in the bearing stratum is 12.2 m under DA1 and 13.3 m under DA2. Bored piles are different: their R4 base factor of 1.6 can make DA1 the stricter approach for an end-bearing pile.
Sources
JRC EUR 26227 (2013), Eurocode 7: Geotechnical Design. Worked examples, §8.5, Tables 3.3.3, 8.4.1 and 8.4.3 and example A.8.2; Orr (2007), Eurocode 7 and the Irish National Annex. Values are the recommended ones unless stated. Check them against the standard and National Annex that govern your project.
Keep reading
Eurocode 7 pile design: a step-by-step guide (EN 1997-1)
How to design a pile to Eurocode 7: design actions, characteristic resistance from load tests or calculation, Design Approaches, partial factors and a published check.
ReadEurocode 7 pile design worked example (DA1, DA2, DA3)
A driven pile in stiff clay sized under all three Design Approaches, following JRC example A.8.2 step by step, with the same case run in PileCalc.
ReadEurocode 7 correlation factors ξ1 to ξ4 for pile resistance
Correlation factor tables for EN 1997-1, the UK and Irish National Annexes and NTC 2018, with worked examples of characteristic pile resistance from load tests.
ReadSee it for yourself
Run a laterally loaded pile in your browser — with the deflected shape, moment diagram, and every input explained.
Launch the app