Slope stability analysis: factor of safety, the method of slices, and a worked example
Slope stability analysis from first principles: factor of safety, the method of slices, Bishop's simplified method and groundwater, with a worked example.
A slope stability analysis answers one question: is the soil strong enough to hold up its own weight? This guide builds the answer from first principles. It covers what a factor of safety means, why engineers cut a slope into slices, the ordinary method and Bishop's simplified method, and what groundwater does to the result. Then it works one slope by hand and by a search of 968 circles. In that example the factor of safety falls from 1.62 to 1.04 without a single kilonewton of added weight.
What the factor of safety means
Picture a block resting on a ramp. Gravity pulls it down the ramp and friction holds it back. The factor of safety is the ratio of the two: the resistance available, divided by the resistance needed. At 1.0 the block is on the point of sliding. At 1.5 it has 50% in reserve.
Soil works the same way, except that its resistance is its shear strength, which has two parts. Cohesion is there no matter what. Friction depends on how hard the grains are pressed together. That is the Mohr-Coulomb equation:
strength = c′ + σ′ tan φ′
Here c′ is the cohesion, σ′ is the effective normal stress on the surface, and φ′ is the friction angle. The normal stress is the term to watch, because everything that follows is about finding it.
For a permanent slope, guidance such as the US Army Corps of Engineers slope stability manual (EM 1110-2-1902) typically asks for a long-term factor of safety of at least 1.5. Your project's governing standard sets the number that applies.
Why a slip circle
A slope has no ramp to slide on, so it makes its own. Swedish engineers investigating a quay failure in Gothenburg in 1916 noticed that the failure surface was close to the arc of a circle, and that gave them a way to do the math. Assume a circular slip surface. The soil above it wants to rotate about the centre of the circle. The weight of the soil drives the rotation, and the shear strength along the arc resists it.
The catch is the normal stress. It is high deep under the crest and almost nothing near the toe, so no single number describes it along the arc.
The method of slices
The method of slices solves that by dividing the sliding mass into vertical slices. Each slice is narrow enough that its base is nearly straight, at its own angle α. Now every slice is a block on a ramp:
- Its weight W has a component along the base, W sin α, that drives the slide.
- The component pressing into the base is the normal force that gives the soil its friction.
- Sum the driving forces of all slices, sum the resisting forces, and divide.
One problem remains. Each slice also pushes on its neighbours, and those side forces are unknown. There are more unknowns than equations, so every method of slices needs an assumption about them.
The ordinary method of slices
The oldest answer, from Wolmar Fellenius in the 1920s, is to ignore the side forces completely. This is the ordinary method of slices, also called the Swedish method. It can be done by hand in one pass. But ignoring the side forces underestimates the normal force on the base, so the factor of safety usually comes out low, and it can be much too low when pore pressures are high.
Bishop's simplified method
In 1955 Alan Bishop kept the side forces but assumed they act horizontally. They then drop out of the vertical force balance on each slice, and vertical equilibrium gives the normal force on the base directly. The price is that the normal force now depends on how much of the shear strength is in use, which depends on the factor of safety. The factor of safety appears on both sides of the equation, so you guess a value, calculate a new one and repeat. It settles in a handful of rounds.
For circular slip surfaces, Bishop's simplified method usually lands within a few percent of the more rigorous methods, which is why it is still a standard.
The critical circle
Either method gives the factor of safety for one circle. A slope does not fail on the circle you picked. It fails on the weakest one. So the analysis checks hundreds of circles with different centres and radii and keeps the lowest factor of safety. That circle is the critical circle, and the search is a job for software.
What water does
Below the water table, the spaces between soil grains are full of water under pressure. That pore pressure carries part of the normal force, and water has no shear strength. Friction only gets what is left, the effective stress.
In the equations it is one change: on the base of every slice, subtract the water force from the normal force. The weight of the slice has not changed and neither has the driving force, but the friction holding it back has dropped. That is why slopes fail after rain. The water does not need to add weight. It takes away strength.
In an analysis, groundwater goes in as a piezometric line: the level water would rise to in a standpipe. The pore pressure at the base of a slice is the unit weight of water times the height of that line above the base.
Worked example: a 10 m slope
| Input | Value |
|---|---|
| Slope | 10 m high at 2 horizontal to 1 vertical |
| Soil | Silty sand |
| Unit weight | 19 kN/m³ |
| Cohesion c′ | 5 kPa |
| Friction angle φ′ | 30° |
| Trial circle | Through the toe, radius 28 m |
One circle by hand
- Per metre along the slope, the soil above the circle weighs about 930 kN.
- Take one slice: about 0.5 m wide, weight 33 kN, base at 27°. It drives the slide with about 15 kN, and by Bishop's equation its base can resist with about 21 kN.
- Do the same for every slice and add them up: driving 383 kN, resisting 620 kN.
- Factor of safety = 620 / 383 = 1.62. Starting from a guess of 1.0, the iteration runs 1.49, 1.60, 1.62 and settles.
- The ordinary method on the same slices gives 1.56, about 4% lower.
The same circle with high groundwater
Now raise the groundwater until it is close to the surface (a piezometric line 9 m high at the back of the slope and 8.5 m under the crest, falling to ground level at the toe). On the same circle, water pushes up on the slip surface with 356 kN. The driving force barely moves, at 379 kN. The resistance falls from 620 to 406 kN, and the factor of safety drops to 1.07.
Searching 968 circles
One circle is not the answer, so the next step is a grid search: centres from 10 to 24 m across and 14 to 34 m up, and radii from 14 to 34 m. That is 968 trial circles. Circles that miss the slope are set aside, and each of the rest gets a Bishop analysis.
| Groundwater | Critical factor of safety | What changed |
|---|---|---|
| None | 1.62 | The critical circle is the toe circle checked by hand |
| Normal (6 m at the back, 5 m under the crest) | 1.40 | The critical circle moves deeper |
| Wet season (9 m at the back, 8.5 m under the crest) | 1.04 | Barely standing |
The wet-season search gives 1.04, lower than the 1.07 from the hand-checked circle, because with water present a different circle is the weakest. That is the reason to search again every time the groundwater changes.
You can run the same model in PileCalc's global slope stability tool: enter the terrain as a table of points, the soil, the search grid and a piezometric line, and the report lists every circle searched, the slices of the critical circle, and the equations and references behind them.
Four checks before you trust a factor of safety
- Check the search. If the critical circle sits on the edge of the search grid, the real minimum is probably outside it. Widen the grid until the critical circle is inside.
- Match the strength to the question. Drained strengths for the long term, undrained strength for a clay slope right after construction, and no cohesion you cannot rely on.
- Use the worst groundwater the slope will ever see, not the level on the day of the boring.
- Know the method's limits. Bishop's simplified method is for circular surfaces. A thin weak layer can make a slope fail along a surface that is not a circle, and that needs a different method.
Common questions
What is a good factor of safety for a slope?
It depends on the standard and the condition being checked. For the long-term stability of a permanent slope, guidance such as the US Army Corps of Engineers manual EM 1110-2-1902 typically asks for at least 1.5, with lower values accepted for some temporary or end-of-construction conditions. Use the value in your project's governing standard.
What is the difference between the ordinary method of slices and Bishop's simplified method?
The ordinary (Swedish, or Fellenius) method ignores the forces between slices, so it can be solved in one pass but usually gives a low factor of safety. Bishop's simplified method assumes the side forces are horizontal and satisfies vertical equilibrium for each slice, which needs a short iteration and is usually within a few percent of rigorous methods for circular surfaces. In this example they give 1.56 and 1.62.
Why do slopes fail after heavy rain?
Rain raises pore water pressure in the slope. Pore pressure reduces the effective normal stress on the slip surface, and with it the frictional strength, while the driving force stays nearly the same. In this example, raising the groundwater takes the factor of safety from 1.62 to 1.04 with no added weight.
What is the critical slip circle?
It is the trial circle with the lowest factor of safety. An analysis checks many circles with different centres and radii, and the lowest result is the slope's factor of safety for circular failure. If the critical circle lies on the boundary of the search, widen the search.
Results are from the PileCalc engine for the inputs shown, rounded. This guide is educational and does not replace a site-specific design.
Keep reading
Drag load and the neutral plane: worked example
How to calculate drag load from negative skin friction: find the neutral plane, sum the friction above it, and run the three design checks. Worked example.
ReadDrilled shaft capacity: alpha and beta methods
Drilled shaft capacity by hand: the alpha method in clay, the beta method in sand, base resistance, and why the base carries so little at working load.
ReadPile cap design: worked example
Pile cap design step by step: pile reactions from the pile group equation, then one-way shear, punching shear and flexure for a nine-pile cap.
ReadSee it for yourself
Run a laterally loaded pile in your browser — with the deflected shape, moment diagram, and every input explained.
Launch the app