How to calculate drag load from negative skin friction: find the neutral plane, sum the friction above it, and run the three design checks. Worked example.


The drag load on a pile is the force that settling soil adds to it through negative skin friction. It builds up from the pile head down to the neutral plane, where the pile and the soil settle by the same amount, and that is where the force in the pile is largest. This guide works one example from start to finish: a pile that carries 600 kN at its head and 966 kN eleven metres down.

For the mechanism and when it happens, read negative skin friction and downdrag first. This post is the arithmetic.

The example

InputValue
PileDriven concrete, 0.5 m diameter, 20 m long
0 to 2 mSand fill, friction angle 32°, unit weight 19 kN/m³
2 to 12 mSoft clay, undrained strength 25 kPa, unit weight 17 kN/m³
12 to 25 mDense sand, friction angle 36°, unit weight 19.5 kN/m³
Water table2 m below the surface
Sustained head load600 kN
Ground settlement100 mm at the surface, falling in a straight line to zero at 12 m

The fill is new, so the clay under it is still consolidating. The settlement profile is the input that matters most, and its most important number is the depth where settlement stops: here, the base of the clay.

Step 1: find the neutral plane

The neutral plane is where two curves cross: the settlement of the soil against depth and the settlement of the pile against depth. Above the crossing the soil moves down more than the pile, so the friction on the shaft points down. Below it the pile moves down more than the soil, so the friction points up.

It is also a balance of forces. Everything pushing down above the neutral plane must equal everything pushing up below it:

head load + drag load + pile weight above = positive shaft friction below + toe resistance (less the pile weight below)

The two definitions depend on each other. The pile's settlement depends on the forces in it, and the forces depend on where the neutral plane is. That is why finding it takes iteration, and why it is the step to give to software. For this pile the load-transfer analysis puts the neutral plane at 10.9 m, about a metre above the base of the clay.

A quick way to bracket it by hand: the neutral plane can never be deeper than the depth where the soil stops settling (12 m here), and for a pile with a good bearing layer under soft soil it is usually close to that depth.

Step 2: add up the friction above it

The drag load is the shaft friction summed from the surface to the neutral plane. The perimeter of a 0.5 m pile is π × 0.5 = 1.57 m.

  1. Sand fill, 0 to 2 m. The friction grows with depth as the effective stress grows, from zero at the surface to about 13 kPa at 2 m. Over 2 m of shaft that adds up to about 22 kN.
  2. Soft clay, 2 to 10.9 m. The limiting adhesion is 22.5 kPa (0.9 times the undrained strength). Over 8.9 m of shaft: 22.5 × 1.57 × 8.9 = 314 kN.
  3. Total. 22 + 314 = 336 kN if every metre is fully mobilized.

The full analysis gives 332 kN. It is a little lower than the hand total because friction needs relative movement. In the last half metre above the neutral plane the pile and the soil are moving almost together, so the friction there has not reached its limit. The video rounds the same check to about 330 kN.

Step 3: the maximum force in the pile

Add the head load, the drag load and the weight of the pile above the neutral plane (buoyant below the water table):

600 + 332 + 34 = 966 kN at 10.9 m

That is 61% more than the load applied at the head, and it acts eleven metres underground, not at the top. Below the neutral plane, positive friction in the last of the clay and in the dense sand takes load back out, and about 519 kN arrives at the toe.

Step 4: the three checks

The neutral plane method (Fellenius; adopted in FHWA guidance) treats drag load and downdrag as two different problems.

CheckLoadsIn this example
Structural strength of the pile, at the neutral planeDead load + drag load966 kN unfactored. With factors of 1.25 on dead load and pile weight and 1.5 on drag load, 1,290 kN
Geotechnical capacityDead load + live load, no drag loadDrag load is not included
SettlementMovement at the neutral planeThe pile head settles 11 mm while the ground surface settles 100 mm

Drag load is left out of the capacity check because a pile that is failing in the ground moves down relative to the soil along its whole length, which turns all of the friction positive. For the same reason drag load and live load do not add: a short-term load pushes the pile down and sheds drag load as it arrives. Some codes are more conservative and count drag load against capacity, so check which rule governs your project.

What changes the answer

Three more runs of the same model show what the drag load is sensitive to, and what it is not.

ChangeNeutral planeDrag loadPile head settlement
Base case: 100 mm of settlement, 600 kN10.9 m332 kN11 mm
Settlement doubled to 200 mm352 kN (6% more)
Settlement cut to 20 mm222 kN (two thirds)
Head load raised to 1,000 kN9.9 m298 kN19 mm
  • The amount of settlement hardly matters. A few millimetres of slip mobilizes the full friction, so doubling the settlement adds 6%, and a fifth of the settlement still gives two thirds of the drag load.
  • The depth where settlement stops matters a great deal. It caps the neutral plane, and every extra metre of settling clay above the neutral plane adds about 35 kN here.
  • More head load means less drag load. The pile settles more, the neutral plane moves up, and the drag load shrinks. The pile also settles more, so this is not a way to design.

Run it yourself

You can build this model in PileCalc's downdrag tool in a couple of minutes: the pile, the head load, the settlement profile and three soil layers. It returns the neutral plane, the drag load, the maximum force, the factored demand, and depth plots of axial force and of pile and soil settlement, with a PDF report of the inputs, equations and references.

Common questions

What is the difference between drag load and downdrag?

Drag load is a force: the load that negative skin friction adds to the pile, checked against the structural strength of the pile at the neutral plane. Downdrag is a movement: the settlement of the pile as the soil at the neutral plane settles. One is a strength check and the other is a settlement check.

How do you find the neutral plane of a pile?

It is the depth where the pile and the soil settle by the same amount, which is also the depth where the downward forces above balance the upward resistance below. Because pile settlement and the forces depend on each other, it is found by iteration, normally with a load-transfer (t-z) analysis. It cannot be deeper than the depth where the soil stops settling.

Does drag load reduce a pile's bearing capacity?

Not in the neutral plane method. At geotechnical failure the pile moves down relative to the soil over its whole length, so all shaft friction acts upward and the drag load is gone. Drag load is a structural load on the pile. Some codes are more conservative and do count it against capacity.

Does more ground settlement mean more drag load?

Only slightly. Shaft friction is fully mobilized after a few millimetres of relative movement. In the worked example, doubling the settlement from 100 mm to 200 mm raises the drag load from 332 kN to 352 kN, which is 6%.

Results are from the PileCalc engine for the inputs shown, rounded. This guide is educational and does not replace a site-specific design.

Keep reading

Guides
November 28, 2026

Drilled shaft capacity: alpha and beta methods

Drilled shaft capacity by hand: the alpha method in clay, the beta method in sand, base resistance, and why the base carries so little at working load.

Read
Guides
November 28, 2026

Slope stability and the method of slices: worked example

Slope stability analysis from first principles: factor of safety, the method of slices, Bishop's simplified method and groundwater, with a worked example.

Read
Guides
November 28, 2026

Pile cap design: worked example

Pile cap design step by step: pile reactions from the pile group equation, then one-way shear, punching shear and flexure for a nine-pile cap.

Read

See it for yourself

Run a laterally loaded pile in your browser — with the deflected shape, moment diagram, and every input explained.

Launch the app