Drilled shaft capacity is the sum of two things: side resistance along the shaft and base resistance at the bottom. This guide works one shaft by hand with the method in the FHWA drilled shaft manual by O'Neill and Reese (1999): the alpha method in clay, the beta method in sand, and base resistance from the blow count. It ends with the result that surprises most people the first time they see it. The base of this shaft can hold 452 kip, and at the working load it carries 22.

What a drilled shaft is, and why it gets its own method

A rig drills a round hole to the design depth, a cage of reinforcing steel is lowered in, and the hole is filled with concrete. The result is a column of reinforced concrete cast in the ground. The same foundation is also called a bored pile, a drilled pier or a caisson.

A driven pile pushes the soil aside and squeezes it. A drilled shaft removes the soil, the ground around the hole relaxes, and the base sits on whatever the drilling tools left behind. So the same soil gives different numbers for a drilled shaft than for a driven pile, and the two should not share coefficients. For the general idea of side and tip resistance, see skin friction vs end bearing.

The worked example

InputValue
Shaft4 ft diameter, 50 ft long, no bell
Clay, 0 to 30 ftUndrained strength su = 2 ksf, unit weight 125 pcf
Sand, below 30 ftSPT blow count N = 30, unit weight 125 pcf
Water table30 ft
Factor of safety2.5
Service load600 kip

The perimeter of the shaft is 4π = 12.57 ft, and the base area is 12.57 ft² (the two happen to match for a 4 ft diameter).

Side resistance in clay: the alpha method

Clay grips the concrete, and stronger clay grips harder. The unit side resistance is the undrained shear strength times a factor, alpha: f = α × su. For a drilled shaft, alpha is 0.55 for clays with a strength up to about 3 ksf. Above that it falls linearly, to 0.45 at a little over 5 ksf.

Alpha is only about half because drilling disturbs the clay on the wall of the hole. It relaxes toward the opening and takes up water from the wet concrete. For the 2 ksf clay in the example, f = 0.55 × 2 = 1.1 ksf.

The zones the method does not count

The method leaves two zones of clay out of the side resistance:

  1. The top 5 ft. Near the surface, clay shrinks in dry seasons and can pull away from the concrete, and lateral loads can open a gap. If seasonal moisture change goes deeper on your site, leave out more.
  2. The bottom one diameter, when the base bears in clay. As the base pushes down, the clay just above it is stretched and can lose its grip. With a bell, leave out the bell and one bell diameter of shaft above it.

In the example the base is in sand, so only the top 5 ft are lost. Of the 30 ft of clay, 25 ft count: 25 ft × 12.57 ft × 1.1 ksf = 346 kip.

Side resistance in sand: the beta method

Sand grips by friction, and friction depends on how hard the ground presses against the shaft. The unit side resistance is the vertical effective stress times a factor, beta: f = β × σ'v. Beta combines the lateral earth pressure coefficient and the friction between soil and concrete in one number, and in this method it depends only on depth:

β = 1.5 − 0.135 √z (z in feet), with 0.25 ≤ β ≤ 1.2

If the sand is loose, with a blow count under 15, beta is scaled by N/15. The unit side resistance is capped at about 4.2 ksf.

DepthBetaEffective stressUnit side resistance
30 ft (top of sand)0.763.75 ksfabout 2.9 ksf
50 ft (base)0.545.00 ksfabout 2.7 ksf

Beta falls with depth while the stress climbs, and the two nearly cancel. The side resistance is about 2.8 ksf all the way down the sand, and over 20 ft of shaft it adds up to 706 kip.

Base resistance

Soil at the baseUnit base resistance
ClayNc × su, with Nc = 9 for stiff clay and lower for softer clay, down to 6.5
Sand1.2 × N in ksf, with N limited to 50
Sound, massive rock2.5 × qu (unconfined compressive strength), when the shaft is socketed at least 1.5 base diameters into the rock

The sand rule has no friction angle and no bearing capacity factor. It is an empirical rule taken from load tests, and it is defined at a base settlement of 5% of the diameter. That detail matters below.

For the example: 1.2 × 30 = 36 ksf, times 12.57 ft², is 452 kip.

Ultimate and allowable capacity

ComponentResistance
Side, clay (5 to 30 ft)346 kip
Side, sand (30 to 50 ft)706 kip
Base452 kip
Ultimate capacity1,504 kip
Allowable load (factor of safety 2.5)601 kip

Why the base carries so little at working load

Resistance has to be mobilized, and that takes movement. The side is stiff: it reaches its full resistance when the shaft has settled about 0.5% to 1% of its diameter, a quarter to half an inch for a 4 ft shaft. The base is soft: in sand it needs about 5% of the diameter, nearly two and a half inches.

Load on the shaftSettlementSide carriesBase carries
600 kip (service)0.11 in578 kip22 kip
1,000 kip0.27 in939 kip62 kip

At the service load the side is using more than half of what it has, and the base less than 5%. Three things follow:

  1. A factor of safety on the total does not mean the side and the base are working equally hard.
  2. For large shafts, settlement governs rather than capacity. The method reduces the base resistance of shafts wider than about 50 in in sand unless you calculate the settlement directly.
  3. The base only works if it is clean. A few inches of loose cuttings at the bottom of the hole mean the base needs even more movement before it carries anything.

For more on reading this kind of result, see how to read a pile load-settlement curve.

Making the shaft longer

Suppose the column load grows to 700 kip. The allowable load is 601 kip, so the 50 ft shaft is overloaded. At 60 ft the ultimate capacity rises to 1,835 kip and the allowable to 734 kip. The base is still 452 kip, because the blow count at the base has not changed. Every kip gained came from the side.

Four checks before you trust a drilled shaft design

  1. Construction. These numbers assume a dry, stable, open hole. Slurry, casing or a hole left open too long can change the side resistance, so the design and the construction method have to match.
  2. The base. If you count on base resistance, the bottom of the hole has to be cleaned and inspected before the concrete goes in.
  3. Settlement. Check the settlement at the working load, not just the capacity, especially for large diameters.
  4. The soil data. The clay strength and the blow counts must come from the depths that matter. On an important job, a load test is the real proof.

You can run the same model in PileCalc's drilled shaft tool in a couple of minutes: enter the shaft, two soil layers, the water table and the service load, and it returns the capacity, the settlement and how the load splits between side and base.

Common questions

What is the alpha method for drilled shafts?

It gives the unit side resistance in clay as alpha times the undrained shear strength. In the FHWA 1999 method, alpha is 0.55 for strengths up to about 3 ksf and falls to 0.45 at a little over 5 ksf. The top 5 ft of clay are not counted, and neither is the bottom one diameter when the base bears in clay.

What is the beta method for drilled shafts?

It gives the unit side resistance in sand as beta times the vertical effective stress. In the FHWA 1999 method, beta = 1.5 − 0.135 √z with z in feet, limited to between 0.25 and 1.2, scaled down for sand with a blow count under 15, and with the unit side resistance capped at about 4.2 ksf.

How do you calculate the base resistance of a drilled shaft in sand?

In the FHWA 1999 method the unit base resistance in ksf is 1.2 times the SPT blow count, with the blow count limited to 50. Multiply by the base area. The value corresponds to a base settlement of 5% of the diameter.

Why does the base of a drilled shaft carry so little load?

Because the base needs far more movement than the side to mobilize its resistance: about 5% of the diameter in sand, against 0.5% to 1% for the side. At working loads the shaft has settled only a fraction of an inch, so the side carries nearly everything. In the worked example the base carries 22 kip of a 600 kip load.

Is a drilled shaft the same as a bored pile or a caisson?

Yes. Drilled shaft, bored pile, drilled pier and caisson are regional names for the same foundation: a drilled hole with a reinforcing cage, filled with concrete.

Results are from the PileCalc engine for the inputs shown, rounded. This guide is educational and does not replace a site-specific design.

Keep reading

Guides
November 28, 2026

Drag load and the neutral plane: worked example

How to calculate drag load from negative skin friction: find the neutral plane, sum the friction above it, and run the three design checks. Worked example.

Read
Guides
November 28, 2026

Slope stability and the method of slices: worked example

Slope stability analysis from first principles: factor of safety, the method of slices, Bishop's simplified method and groundwater, with a worked example.

Read
Guides
November 28, 2026

Pile cap design: worked example

Pile cap design step by step: pile reactions from the pile group equation, then one-way shear, punching shear and flexure for a nine-pile cap.

Read

See it for yourself

Run a laterally loaded pile in your browser — with the deflected shape, moment diagram, and every input explained.

Launch the app