Pile spacing in a group: what 3D versus 5D changes (worked example)
How far apart should piles in a group be? A worked 3 x 3 pile group at 3 and 5 diameters: capacity, block failure, Converse-Labarre and settlement.
Pile spacing is the one big choice in a pile group. Put the piles close together and the cap is small and cheap. Spread them apart and the cap gets bigger, heavier and more expensive. This guide takes one 3 x 3 group and works it at 3 diameters and at 5 diameters, in sand and in clay, to show what wider spacing buys and what it does not.
Why spacing matters at all
A pile hands its load to the soil, along the shaft in friction and at the tip in bearing, so every loaded pile is surrounded by a zone of stressed soil. At a spacing of about three diameters, centre to centre, the zones of neighbouring piles overlap. The soil between the piles is supporting two, three or four piles at once, and below the tips the separate stress bulbs merge into one, as wide as the group and much deeper than under a single pile.
That overlap can show up in three places: the capacity of the group, the way it fails, and how much it settles. Which of the three matters depends on the soil and on how the piles were installed, and spacing changes each of them differently.
The worked example
| Input | Value |
|---|---|
| Group | 3 x 3, nine driven concrete piles |
| Pile | 0.4 m diameter, 15 m long |
| Spacing | 1.2 m each way (3 diameters), then 2.0 m (5 diameters) |
| Soil | Medium dense sand, unit weight 19 kN/m³, friction angle 33° |
| Water table | 3 m below ground |
| Load | 2,700 kN on the group (300 kN per pile), factor of safety 3 |
A static analysis of one pile gives an ultimate capacity of 1,004 kN, and a settlement of 1.5 mm at its 300 kN share of the load.
What the Converse-Labarre equation says
The oldest estimate of group efficiency is the Converse-Labarre equation. It needs the number of rows, the number of piles per row, the pile diameter and the spacing, and nothing else.
| Spacing | Converse-Labarre efficiency | Implied group capacity |
|---|---|---|
| 2 diameters (0.8 m) | 0.61 | about 5,500 kN |
| 3 diameters (1.2 m) | 0.73 | about 6,600 kN |
| 5 diameters (2.0 m) | 0.83 | about 7,500 kN |
Read on its own, the table says wider spacing buys capacity. But there is no soil in this equation: no strength, no pile length, and nothing about how the piles were installed. Sand or clay, driven or drilled, it gives the same answer. Treat it as a screening number, not a capacity.
Driven piles in sand: spacing does not change the capacity
Driving a pile into loose or medium sand does not remove soil. It pushes the sand sideways and densifies it, and driving a whole group densifies the sand between the piles again and again. Load tests on driven groups in sand often show efficiencies above one. Design practice does not take credit for that, but it does not apply a reduction either: FHWA, the US Army Corps of Engineers and the Navy design manual take the capacity of a driven group in sand, at normal spacing, as the sum of the single piles.
| Result | 3 diameters (1.2 m) | 5 diameters (2.0 m) |
|---|---|---|
| Group ultimate (efficiency of one) | 9,040 kN | 9,040 kN |
| Allowable at a factor of safety of 3 | 3,013 kN | 3,013 kN |
| Equivalent block | about 56,300 kN | about 129,700 kN |
| Converse-Labarre (diagnostic only) | 0.73 | 0.83 |
| Group settlement | about 4 mm | about 5 mm |
The capacity does not move. It was already the full sum of the piles at 3 diameters, and the equivalent block is far above it at either spacing. So in this sand, going from 3 to 5 diameters bought a bigger cap and no extra capacity.
Two conditions sit behind the efficiency of one. The piles are driven, not jetted or pre-drilled, because those methods loosen the sand. And there is no weak layer below the tips. If there is, the whole group can punch into it, and that is a separate check.
Clay: where spacing decides the failure mode
Clay is different. Driving does not densify clay, it remoulds it. And if the piles are close enough, the soil between them is trapped, and the piles and that soil move down together as one block. This is block failure. The block has shear around its perimeter, soil against soil at the full undrained strength, and bearing on its base with a bearing factor of 9 over the whole footprint. The group capacity is the lower of the block and the sum of the single piles.
Take the same nine piles, 0.4 m in diameter and 15 m long, in soft clay with su = 25 kPa. One pile carries about 500 kN, so nine carry about 4,500 kN.
| Spacing | Block capacity | Sum of single piles | Governs | Efficiency |
|---|---|---|---|---|
| 3 diameters (1.2 m) | 5,964 kN | 4,496 kN | Single piles | 1.00 |
| 2 diameters (0.8 m) | 3,900 kN | 4,496 kN | Block | 0.87 |
| 1.5 diameters (0.6 m) | 2,976 kN | 4,496 kN | Block | 0.66 |
For this group the crossover is at about 2.3 diameters. Tighter than that and the block governs, and at 1.5 diameters a third of the capacity is gone. Wider than that and extra spacing adds nothing to capacity. That is one reason design codes keep piles at least two and a half to three diameters apart.
Settlement: the cost every group pays
A single pile stresses a small volume of soil near its tip. A group stresses a zone as wide as the cap, reaching down roughly twice the width of the group, so it settles more than a single pile carrying the same load per pile. It can also reach soft layers a single pile would never feel, which is why a load test on one pile tells you about capacity but not about group settlement.
In sand, a simple empirical rule goes a long way: group settlement is the single pile settlement times the square root of the group width over the pile diameter.
- At 3 diameters the group is 2.8 m wide, so the ratio is 2.8 / 0.4 = 7 and its square root is 2.65. The group settles 1.5 mm x 2.65, about 4 mm.
- At 5 diameters the group is 4.4 m wide, the ratio is 11 and its square root is 3.3. The group settles about 5 mm.
This rule scales with the width of the group, so in the example the wider layout gives a slightly larger estimate, not a smaller one. In clay the usual approach is the equivalent footing: replace the group with an imaginary footing two thirds of the way down the piles, spread the load with depth, and calculate the consolidation below it.
So how far apart should the piles be?
- Start at about 3 diameters. In the clay example that is clear of block failure, and it is at the usual code minimum. Larger groups still need the block check at this spacing.
- Check both failure modes. The sum of the single piles and the block. The lower one governs.
- Do not expect capacity from wider spacing unless the block governed. In driven sand groups the capacity is already the sum of the piles.
- Look below the tips. A weak layer under the group changes both the capacity and the settlement, whatever the spacing.
- Calculate the group settlement. Never assume the group settles like the test pile.
You can run the same group in PileCalc's pile groups tool in about a minute: it reports the sum of the single piles, the equivalent block, Converse-Labarre as a diagnostic and the group settlement side by side, so changing the spacing shows all four at once.
Common questions
What is the minimum spacing for piles in a group?
Design codes and manuals generally keep piles at least 2.5 to 3 pile diameters apart, centre to centre. Closer than that, a group in clay can fail as a single block, and installation gets harder. The governing code for the project sets the actual minimum.
Does wider pile spacing increase the capacity of a pile group?
Only when block failure governed at the tighter spacing. For driven piles in sand the group capacity is taken as the sum of the single piles, so in the worked example going from 3 to 5 diameters left the ultimate capacity at 9,040 kN. In the soft clay example, widening from 1.5 to 3 diameters raised the efficiency from 0.66 to 1.0.
Why does a pile group settle more than a single pile?
The stress zones of the piles merge into one bulb as wide as the group and much deeper than under one pile, so more soil is compressed. In the worked example the single pile settles 1.5 mm and the group about 4 mm at the same load per pile.
Is the Converse-Labarre equation still used?
It is still taught and still appears on exams, and it is useful as a quick screening number. It contains only geometry, so it cannot tell sand from clay or driven piles from drilled ones. Current practice checks the sum of the single piles against the equivalent block instead.
Results are from the PileCalc engine for the inputs shown, rounded. The clay table is the hand calculation from the video. This guide is educational and does not replace a site-specific design.
Keep reading
Drag load and the neutral plane: worked example
How to calculate drag load from negative skin friction: find the neutral plane, sum the friction above it, and run the three design checks. Worked example.
ReadDrilled shaft capacity: alpha and beta methods
Drilled shaft capacity by hand: the alpha method in clay, the beta method in sand, base resistance, and why the base carries so little at working load.
ReadSlope stability and the method of slices: worked example
Slope stability analysis from first principles: factor of safety, the method of slices, Bishop's simplified method and groundwater, with a worked example.