How to read lateral pile analysis results: deflection, moment, shear and soil reaction
A worked p-y example read plot by plot: what the deflection, bending moment, shear and soil reaction profiles of a pile under lateral load tell you, and what to check.
A p-y analysis of a laterally loaded pile returns four profiles down the pile: deflection, bending moment, shear and soil reaction. Each one answers a different design question. This guide reads all four for one worked example, then changes the load and the head fixity to show how the picture shifts.
The example
| Input | Value |
|---|---|
| Pile | 12 m long, 0.6 m diameter, EI = 190,000 kN·m² |
| Layer 1, 0 to 4 m | Soft clay (Matlock), su = 20 kPa, ε₅₀ = 0.01, γ′ = 8 kN/m³ |
| Layer 2, 4 to 12 m | Sand (API), φ = 34°, k = 16,000 kN/m³, γ′ = 10 kN/m³ |
| Load | 150 kN lateral shear at the pile head, static |
| Head | Free to rotate |
You can build the same model in the lateral pile deflection calculator in a couple of minutes. If p-y curves are new to you, start with What is a p-y curve?
1. Deflection: will it move too far?
The head moves about 31 mm, and by roughly 6 m below ground the pile has essentially stopped moving.
- What it answers: serviceability. Whether 31 mm is acceptable depends on what the pile supports, and movement is often what governs a lateral design before strength does.
- What to look for: the depth where deflection first returns to zero. Below it the pile is doing very little. If the profile is still moving at the tip, the pile is behaving as a short, rigid pile and is sensitive to its length.
- Common mistake: judging a pile only by head deflection. Two piles with the same head movement can have very different moments.
2. Bending moment: what section do you need?
With a free head the moment is zero at the top and peaks at about 368 kN·m, roughly 4.2 m below the ground surface.
- What it answers: structural design. The peak is the moment the pile section must resist.
- What to look for: the depth of the peak. For a free-head pile it is below ground, not at the surface, which matters when reinforcement or wall thickness changes along the pile.
- Common mistake: assuming the largest moment is at the ground line because that is where the load is.
3. Shear: where is the load handed to the soil?
Shear starts at the applied 150 kN at the head and falls with depth as the soil takes load. It crosses zero exactly where the moment peaks, then reverses.
- What it answers: the shear the section must carry, and a quick consistency check on the run.
- What to look for: the zero crossing lining up with the peak moment. Shear is the slope of the moment diagram, so if the two do not line up, something is wrong with the model or the plot.
4. Soil reaction: is the ground being asked for too much?
Soil reaction is p, the force per unit length the soil applies to the pile. It shows where the ground is doing the work, and where it pushes back the other way below the point of rotation.
- What it answers: how hard each layer is working.
- What to look for: layers sitting at their limit. Where the reaction has flattened against the ultimate resistance of the p-y curve, that soil has nothing more to give and extra load is pushed deeper.
- Common mistake: ignoring this plot. It is the one that explains why the other three look the way they do.
Double the load and the answers do not double
Raise the shear from 150 kN to 300 kN and the head deflection goes from about 31 mm to about 81 mm, which is 2.6 times the movement for 2 times the load. The peak moment more than doubles as well.
The shallow soil has yielded, so the load is carried deeper. This is why lateral results cannot be scaled. Every load level, and every load combination, needs its own run. A load sweep traces the whole load-deflection curve in one go and shows how close the design load is to the point where movement runs away.
Fix the head and the design changes
Keep the same pile, soil and 150 kN load, but cast the head into a stiff cap so it cannot rotate.
| Free head | Fixed head | |
|---|---|---|
| Head deflection | about 31 mm | about 8 mm |
| Maximum moment | about 368 kN·m | about 324 kN·m |
| Where it occurs | about 4.2 m below ground | at the pile head |
Deflection drops to roughly a quarter, but the largest moment moves to the connection between the pile and the cap. That connection now has to be designed for it. Real pile heads usually sit somewhere between the two cases, so it is worth running both.
Four checks before you trust the result
- The top few meters of soil matter most. The shallow soil controls the response, so that is where good soil data pays off.
- Use cyclic curves for wind, wave or seismic loading. Static curves can make the pile look better than it is.
- Piles in a group shadow each other. Reduce their resistance with p-multipliers.
- A p-y analysis is a model. It is only as good as the soil parameters you give it, and it does not replace engineering judgment.
Try it yourself
Open the lateral pile deflection calculator, enter the table above and run it. For the full design sequence, see How to design a laterally loaded pile, and for the method and its sources, the lateral pile docs.
Common questions
Why is the maximum moment below the ground surface?
With a free head there is no moment at the top. The moment builds as the shear acts over depth and peaks where the soil has absorbed enough load for the shear to reach zero. A fixed head changes this and puts the largest moment at the pile head.
Can I scale lateral pile results for a different load?
No. Soil resistance is nonlinear, so deflection and moment grow faster than the load. In this example doubling the load gives about 2.6 times the head deflection. Run each load level separately.
Which plot matters most?
It depends on what governs. Deflection answers serviceability, moment and shear size the section, and soil reaction shows whether the ground is near its limit. Read all four together.
How do I know the pile is long enough?
Look at the deflection profile. If it crosses zero and the lower part of the pile barely moves, extra length adds little. If the tip is still moving, the response depends on length and the pile should be checked at a longer embedment.
Results are from the PileCalc engine for the inputs shown, rounded. With the default 100 increments the app reports 30.8 mm and 368 kN·m for the free head and 323 kN·m for the fixed head.
Keep reading
Helical pile capacity: individual bearing vs cylindrical shear
How to calculate helical pile capacity by the individual bearing and cylindrical shear methods, why helix spacing decides which governs, and how to set a target installation torque.
ReadBearing capacity of soil: worked footing example
Bearing capacity of soil from first principles: Terzaghi's three terms, the Nc, Nq and Nγ factors, and a worked 2 m footing with settlement, eccentric load and groundwater.
ReadHow to read a pile load-settlement curve
A worked axial pile example read point by point: how skin friction and end bearing share the load as a pile settles, where the curve bends, and how to pick a capacity at a settlement limit.
ReadSee it for yourself
Run a laterally loaded pile in your browser — with the deflected shape, moment diagram, and every input explained.
Launch the app